Current projects
At the present time, the company's employees are participating in the field tests of a flat dilatometer and formulate a statistical analysis of the results obtained to determine the strain modulus and compare them with classical field methods such as static sounding, stamping tests, and laboratory studies in triaxial compression conditions.
In the case of good convergence of the received data with other methods, this will allow introducing this method for general use and optimizes the process of obtaining the general deformation module and its accuracy for each selected engineering-geological element by increasing the number of measurements of particular values in the array.
Research sites:
- Development of the 8th microdistrict Solnechny-2 in the Saratov Region, Saratov;
- A different-storey building at street Viktorenko 11 Moscow.
-
24.11.18Our laboratory passed an internal audit of Russian Railways and was allowed to perform laboratory tests on the object: “Railway Bypass of Saratov”.
-
24.11.18Our company received a positive local conclusion on engineering-geological and engineering-ecological surveys on the object: "Pushkin State Museum of Fine Arts"
-
24.11.18Our company received a positive conclusion on the engineering and geological surveys on the object: “Overhaul of the M-5 Ural Moscow-Ryazan-Penza-Samara-Ufa-Chelyabinsk highway in km 584 + 00