News
-
24.11.18Our laboratory passed an internal audit of Russian Railways and was allowed to perform laboratory tests on the object: “Railway Bypass of Saratov”.
-
24.11.18Our company received a positive local conclusion on engineering-geological and engineering-ecological surveys on the object: "Pushkin State Museum of Fine Arts"
-
24.11.18Our company received a positive conclusion on the engineering and geological surveys on the object: “Overhaul of the M-5 Ural Moscow-Ryazan-Penza-Samara-Ufa-Chelyabinsk highway in km 584 + 00
-
24.11.18Our company takes part in the implementation of the large infrastructure facility “Northern latitudinal way”.
-
17.04.18The employees of our company will take part in the research work of the Research
-
18.03.18Our company has started to carry out engineering surveys
-
14.02.18Our company received a positive opinion of the state examination of the city of Moscow
-
10.10.17As part of the project to restore the Pushkin Museum in Moscow
-
23.09.17Our company has reached an agreement with the investor
-
20.08.17Our company, within the framework of the project to restore the Pushkin Museum in Moscow
-
30.05.17Our company performs aerial photography of scales 1: 500 1: 1000!
-
29.05.17Our company has put into operation the equipment for determining the soil soils
-
29.05.17Our company takes part in the implementation of a unique object
-
11.05.17The company began preparations for the extension of the geodetic license
-
24.04.17The positive conclusion of the Federal autonomous institution "Main Department of State Expertise" of Saratov
-
10.02.17The positive conclusion of the Federal autonomous institution "Main Department of State Expertise" St. Petersburg
-
22.09.16Our company received a positive opinion of the expertise on the construction of Viktorenko 11 Moscow first turn
-
20.05.16After our comprehensive inspection, our company received a positive opinion from the Central Expert Commission
-
10.03.16Our company underwent a planned check-up Self-Regulating Organization Non-commercial Partnership "Centrizyskania" for compliance with the declared types of work at sites of an increased level
-
02.02.16Our company continues to work on determining the soil soaking area under the base of the main building of the ELP, Engels
-
20.10.15Our company has concluded a large contract for engineering surveys
-
24.09.15The company successfully passed the certification for compliance with the requirements of the GAZPROMCERT system in the field of engineering surveys
-
20.03.15Our company began to perform engineering surveys at the object K-117 of the Republic of Crimea South Coast
-
18.08.14Specialists of our company took part in a working meeting to discuss the research program for the design of the Akhmat Tower in Grozny
-
05.06.14The company in conjunction with research-and-production enterprise «Geotek» Penza began field testing of a flat dilatometer at the site of surveys of the 8th microdistrict of Saratov
-
20.05.13The tender for the complex engineering survey for the major overhaul of the site of the main gas pipeline "GRS Konny" was won. LLC "Gazprom transgaz Volgograd".
-
20.05.13Now, when ordering a laboratory, we can come for samples ourselves to the site of research!
-
20.05.13Accreditation of the ground laboratory at the address of Engels, Saratov region streen Studencheskaya 68В.