Our company received a positive opinion of the state examination of the city of Moscow
Our company received a positive opinion of the state examination of the city of Moscow
Our company received a positive opinion of the state examination of the city of Moscow for engineering surveys for the construction of the second stage of residential development at the address of Moscow street Viktorenko 11.
News
-
24.11.18Our laboratory passed an internal audit of Russian Railways and was allowed to perform laboratory tests on the object: “Railway Bypass of Saratov”.
-
24.11.18Our company received a positive local conclusion on engineering-geological and engineering-ecological surveys on the object: "Pushkin State Museum of Fine Arts"
-
24.11.18Our company received a positive conclusion on the engineering and geological surveys on the object: “Overhaul of the M-5 Ural Moscow-Ryazan-Penza-Samara-Ufa-Chelyabinsk highway in km 584 + 00